Case Study

Global Supermajor Deploys Aspen PIMS-AO™ Globally

This case study details the methodical approach a global supermajor took, utilizing best-in-class technology, to improve production planning in global refineries and chemical plants with Aspen PIMS-AO technology. Based on side-by-side testing of different technologies, Aspen PIMS-AO led to new insights, increased confidence in results and enhanced conversations with traders.

Case Study

From Reactive to Proactive: Machine Learning Drives Better Business Outcomes

A specialty plastics plant needed a solution to reduce downtime on a problematic hypercompressor in their LDPE production process.

Case Study

Global Oil Producer Leverages Real-World Models to Help Deploy Offshore Control System in Record Time

See how Genesis Consulting reduced “time to first oil” by two weeks, saving $3 million. This was accomplished through HYSYS and HYSYS dynamics models integrated with an FPSO's DCS control systems, for remote DCS testing and checkout.

Case Study

エフピコ:デジタルサプライチェーンを 活用して排出と廃棄物を削減し、 持続可能性目標を達成

エフピコは、日本最大の食品容器メーカーであると同時に、流通サービスプロバイダーとして食品流通関連の店舗(スーパーマーケットなど)に各種製品を納入しています。また、使用済み食品容器やペット ボトルのリサイクルを行う環境先進企業でもあります。

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

How Braskem Idesa Increased Reactor Uptime by Over 20% Using Existing Data and Resources

In this case study, learn how Braskem Idesa used Aspen ProMV™ to proactively identify and correct for conditions that historically led to high reactor fouling.

Case Study

Increasing Capacity in Sulfur Production Using Sulsim Modeling

Siirtec Nigi increased their sulfur production from 50 to 90 tons per day using Aspen HYSYS Sulsim to simulate the case study and conduct a sensitivity analysis around their oxygen enrichment. The new process required minimal equipment changes and no additional downtime other than turnaround.

Case Study

Hitachi Zosen Case Study

ACM is extremely powerful in reducing engineering time by up to 30% for new and novel processes.

Case Study

Leaks in Reboiler Detected With Months of Advance Notice

Learn how a manufacturer of engineering thermoplastics discovered the root cause of recurring failures in their shell-and-tube reboilers using Aspen Mtell prescriptive maintenance.

Case Study

Leading Refiner Reduces Planning Run Times from Hours to Minutes and Finds Profitable Solutions

Learn how this world leader in refining reduced planning runtime from 30 hours to 90 minutes, making the process 95% faster and allowing them to respond to market changes much faster.

Page 187 of 257